Sheet Metal RFQ Checklist: What to Send and How to Read the Quote You Get Back
Sourcing Anjue Metal | Sourcing | 11 min read | Updated Oct 8, 2026
Most quotation delays are not supplier problems. They are missing information - an unstated material, an undefined finish, an unclear quantity, a drawing that does not say whether it is the flat or the formed part. This is the checklist that gets an accurate price back the first time, and how to read what comes back.
- Why Vague RFQs Cost You Money
- What the Drawing Must Say
- The Commercial Questions You Should Answer Up Front
- What a Realistic Quotation Timeline Looks Like
- How to Read the Quotation You Get Back
- Seven Questions Worth Asking About Any Sheet Metal Quote
- Warning Signs in a Quotation
- A Minimal RFQ Template
- Our RFQ Response

Why Vague RFQs Cost You Money
A supplier facing an incomplete enquiry has three choices: ask questions (slower), make assumptions (risky), or price the worst case (more expensive). All three cost you. An RFQ that answers the questions before they are asked typically returns a price in a fraction of the time, and the price is comparable between suppliers because everyone is quoting the same thing.
What the Drawing Must Say
| Item | Why it matters | Common omission |
|---|---|---|
| Units | mm or inch - a factor of 25 error | Both assumed |
| Projection | First or third angle; ISO vs ASME | Symbol omitted |
| Material and grade | SPCC, DC01, SGCC, 5052-H32, 304 | "Mild steel" or "stainless" |
| Thickness in mm | Gauge varies by material | Gauge only |
| Finish and colour | Powder RAL number, plating spec | "Painted" or "as required" |
| Tolerance block | Sets the default for untoleranced dimensions | No block at all |
| Bend radii | Sets tooling and appearance | No radius specified |
| Critical dimensions | Where the tight tolerance applies | Everything tight or nothing tight |
| Hardware list | Inserts, standoffs, hinges, latches, gaskets | "Hardware as needed" |
| Weld symbols or notes | Visible or hidden, sealed or not | No weld callout |
| Surface treatment after welding | Passivation, seam sealant | Not stated |
Two additions that save time on every order: a 3D model (STEP or IGES) alongside the 2D drawing, and a quantity per variant clearly separated.
Note · If you can only send one file, send a STEP model plus a PDF drawing with the finish and quantity written on it. We can dimension from the model, but we cannot guess your finish or your quantity.
The Commercial Questions You Should Answer Up Front
Quantity structure
Give the quantity you need now and the quantity you expect annually. Suppliers price differently for a one-off and for a repeating order, and an annual figure makes the tooling and material story clearer.
Delivery point and Incoterms
Ex-works, FOB, CIF or DDP. This changes price materially for bulky parts. For an enclosure that ships in a crate, freight can be a significant share of the landed cost, so state the destination port or address.
Packaging
Do you need individual packing, foam protection, palletisation, or a custom crate? Unpacked parts stacked on a pallet cost almost nothing extra; a printed, foam-lined carton per unit does not.
Quality documentation
Do you need a material certificate, an inspection report, a first-article report or a full dimensional report? State it up front. Adding it after the order is placed costs more than including it in the RFQ.
Payment terms
Stating your expected terms early avoids a second round of discussion.
What a Realistic Quotation Timeline Looks Like
| Situation | Typical response |
|---|---|
| Complete RFQ, existing part, no questions | Same or next working day |
| Complete RFQ, new part, needs DFM review | 1-3 working days |
| Incomplete RFQ | Adds 1-3 days for clarification |
| New part needing tooling or a special die | 3-5 working days, tooling cost stated separately |
| Complex welded assembly with fixturing | 3-7 working days |
If a supplier quotes in an hour for a complex new part, either they have seen it before or they have priced a guess. Ask which.
How to Read the Quotation You Get Back
A good sheet metal quotation is itemised enough that you can see where the money is. Look for these lines:
| Line | What to check |
|---|---|
| Part number and revision | Does it match the revision you sent? |
| Material | Grade, thickness and supplier-stated basis |
| Unit price by quantity band | The right band for your quantity |
| Setup / programming | A one-off charge - confirm it is not repeated per unit |
| Tooling / die | Is it separately identified, and is it amortised or charged once? |
| Hardware | Are inserts, hinges and gaskets included or excluded? |
| Finishing | Which process, colour, and is masking included? |
| Packing | What it includes |
| Incoterms and origin | Where the price stops, and the country of origin |
| Lead time | Working days, from what point |
| Validity | How long the price holds - particularly for stainless |
| Payment terms | Percentages and timing |
| Exclusions | What is explicitly not included |
The exclusions line is the most under-read part of any quotation. "Excludes crating", "excludes inspection report", "excludes on-site touch-up paint" are all real costs that will appear later.
Seven Questions Worth Asking About Any Sheet Metal Quote
- Which revision of the drawing did you price?
- Is the material price firm for 30 days, or subject to a surcharge? (Critical for stainless.)
- Does the price include deburring and edge treatment, or is that a separate line?
- Is the finish quoted to a colour standard or just a name?
- Is the first article included, or is it charged separately?
- What is the assumed packing, and what would upgrade it cost?
- Which tolerance did you assume for the untoleranced dimensions?
A supplier who answers all seven without hesitation is a supplier who has actually engineered your part rather than estimated it.
Warning Signs in a Quotation
- No tolerance discussion and no DFM comments on a complex part. It suggests the quote was templated rather than engineered.
- One unit price with no quantity bands, when you asked for several volumes.
- A material price with no validity period on stainless.
- No setup or tooling line on a new part with special features - it has probably been absorbed into an inflated unit price.
- Suspiciously uniform pricing across quite different parts, which usually means everyone got the average.
- Finish described only by colour name with no standard, which is how you get two batches that do not match.
A Minimal RFQ Template
- Part name and number, revision.
- Files: STEP model, PDF drawing, and your own flat pattern if you have one.
- Quantity: this order, and annual estimate.
- Material, grade, thickness in mm.
- Finish and colour standard (for example powder coat RAL 7035, textured).
- Hardware to be fitted, by part number or clear description.
- Tolerances: general block plus any critical dimensions.
- Documentation required: material certificate, first article report, inspection report.
- Packing requirement.
- Delivery point and Incoterms.
- Required date.
- Payment terms.
- Application and environment in one sentence - indoor, outdoor, coastal, washdown, temperature range.
That last line is the one most often left out and the one that most changes the answer. Telling a supplier the part goes outdoors near the coast produces a different material recommendation, a different finish and a different gasket than a dry indoor application - and saves a redesign later.
Our RFQ Response
- DFM review included with every quotation at no charge, with the features that drive cost identified.
- Price bands across the quantities you ask for, with tooling and setup shown separately where applicable.
- Stainless and aluminium pricing with a stated validity, because surcharges move.
- Engineering feedback within 24 working hours on drawings we can read, and a clarification request within the same window if something is missing.
- Honest exclusions: we list what is not included rather than letting it surface after the order.
Frequently Asked Questions
A STEP or IGES 3D model plus a 2D PDF drawing, with units, material, thickness in millimetres, finish and colour standard, quantity and hardware written on it. If you already have a flat pattern, send it as a reference. A 3D model lets us check geometry and generate the flat; the drawing carries the specification the model cannot.
For an existing part with a complete enquiry, same or next working day. For a new part needing DFM review, one to three working days. New parts requiring special tooling or a welded fixture may take three to five days. If a complex new part is quoted within an hour, ask whether it was engineered or estimated.
Millimetres, always, especially for export orders. Gauge is not consistent between materials - 18 gauge is about 1.2 mm in mild steel but about 1.0 mm in aluminium - and North American and European gauge tables differ. Stating millimetres removes a whole category of error.
Typically crating or custom packing, third-party inspection, special documentation beyond a material certificate, on-site touch-up paint, and sometimes edge deburring on laser-cut parts. Read the exclusions line carefully - these costs reappear later and are better negotiated at quotation stage.
Because stainless contains nickel and molybdenum, both of which are traded commodities, and suppliers apply a monthly alloy surcharge. A stainless quotation based on a surcharge from three months ago may be significantly out of date. Ask for the validity period and the surcharge basis.
Explore Related Capabilities
- Request a Quotation — Send a drawing and get engineering feedback within 24 working hours
- Custom Sheet Metal Enclosures — Built to drawing from STEP, DXF or PDF
Have a Drawing to Quote?
Send STEP, DXF or PDF drawings and we reply with engineering feedback and a detailed quotation within 24 hours on working days.